EXPERIENCE

150MW Hydrogen Electrolyzer Facility

This project included front-end engineering services and project development support for a hydrogen production facility with 150MW of electrolyzer capacity. A preliminary system mass and water balance was performed, and water pretreatment (RO, Deionization) and post-treatment (wastewater) was included within the design. This project included the integration of electrolyzer systems, gas management systems, and the inclusion of a hydrogen storage yard. The FEED package included a basic project schedule, order-of-magnitude (OOM) project cost estimate, operating cost estimate, block flow diagram, major equipment list, site layout drawing, and permitting analysis. Electricity costs were calculated (kWh/kg hydrogen produced) in addition to other important metrics to better understand costs and the relationship between the production tax credit (PTC), investment tax credit (ITC), and overall project feasibility.

Industry
Client
Confidential
Location
California, USA
YEAR COMPLETED
2022
Services Performed
FEED Package
Team Members Involved
Shawn Parmelee, PE
Kyle Barnett
Nick Remeta, PE
We've done it all

Explore Other Experience