250MW DC Solar Facility with 250MW BESS Layout Development

Isomer provided front-end civil engineering services and project development support to obtain the Conditional Use Permit (CUP) for a 270 MW-DC solar facility with a 250-MW BESS located on 1,700-acres in Georgia. The project site consisted of four (4) parcels of existing woodland with areas of FEMA identified floodplain/floodways bisecting the site. Preliminary solar generation calculations were performed to simulate the project and determine anticipated output and design specifications (panel type and orientation, pitch, GCR, inverter selection, string length). Isomer engineers worked closely with the client and local authorities to determine the regulations that govern the project and to develop a conceptual site plan detailing the location and orientation of the site infrastructure including: switching station, substation, BESS area, operation and maintenance building, access roads and the solar arrays to maximize the overall system capacity while avoiding wetlands.

Industry
Client
Confidential
Location
Georgia, USA
YEAR COMPLETED
2022
Services Performed
FEED Package
Team Members Involved
Daniel Deery, PE, SE
Shawn Parmelee, PE
Nick Remeta, PE
Kyle Barnett
We've done it all

Explore Other Experience