FEL1 and capital cost estimate development for the addition of a hydrocyclone cleaner to protect refiners from contaminants at an existing 30TPD ag-based pulping line.
FEL3 engineering package for the installation of two new reactors to replace an existing end-of-life reactor vessel at a specialty chemicals facility.
Detailed design engineering to support the installation of a new four million gallon molasses storage tank at an operating sugar mill to improve the business's commercial flexibility.
FEL-2 design to support upgrades to an existing linerboard paper machine roll handling line, including conveyors, a lowerator, and shipping floor conveyors for loading finished product rolls into railcars.
This scope consisted of front-end engineering and detailed design to increase the bark firing capacity of an existing combination boiler at a paper mill. Initial studies identified issues, and the project team proceeded...
Conceptual engineering evaluating alternatives for a new finished product tank farm, replacing one large field-erected tank with shop-fabricated tanks and assessing enclosure options to minimize operational disruption.
Isomer provided detailed design for a $6 million battery storage project to enhance grid stability by providing additional capacity during times of peak consumption for the city utility.
Independent reviews of several projects ranging from $50-800MM TIC to serve as input prior to final project funding, including visits to project sites to conduct multiday in-person interviews and site walks to supplement desktop review.
Front end engineering design and technology trials support for a liquor coproduct contaminant reduction system at an existing 30TPD ag-based pulp mill.
Isomer provided conceptual site layout, permitting, and conditional use application support for a portfolio of solar, battery storage, and hydrogen facilities across the US.