FEL1 and capital cost estimate development for the addition of a hydrocyclone cleaner to protect refiners from contaminants at an existing 30TPD ag-based pulping line.
FEL3 engineering package for the installation of two new reactors to replace an existing end-of-life reactor vessel at a specialty chemicals facility.
Detailed design engineering to support the installation of a new four million gallon molasses storage tank at an operating sugar mill to improve the business's commercial flexibility.
FEL-2 design to support upgrades to an existing linerboard paper machine roll handling line, including conveyors, a lowerator, and shipping floor conveyors for loading finished product rolls into railcars.
Full-service conceptual design FEL2 services for the infrastructure project to support the Lithium Battery-grade 47ktpa Refrigerant and 10ktpa Electrolyte Facility Expansion projects at an existing chemicals plant in the southeast.
This effort included the completion of the conceptual design (FEL2) phase for a $5 million USD water sustainability program for an existing Fiber Optics facility with a goal to reduce water consumption at the site by 80%.
Isomer provided front-end engineering and project development services for a 10 ktpa electrochemical process for H2SO4 production, including alternatives analysis for carbon capture and a supplementary cementitious material co-product.
This effort included the FEL2, FEL3 and detailed design for a new glass furnace structure, raw material feed system, and packaging line for a reflective glass bead production facility.
This effort included the front-end engineering, detailed design, and construction oversight to convert all machine DC motors and drives to AC power. The PIVs were also replaced with AC motors.
Civil engineering design, permit coordination, and construction administration for the development of a 2.0-acre site for a 4,500-sf auto glass repair shop and 10,000-sf flex building.