This effort included the FEL2, FEL3 and detailed design for a new glass furnace structure, raw material feed system, and packaging line for a reflective glass bead production facility.
Civil engineering, permit coordination, and construction administration for the re-development of a 0.73-acre existing commercial site for the construction of a Starbucks coffee house.
Isomer completed an engineering review of a proposed facility producing lithium carbonate and rare earth oxides from recycled batteries and magnets, assessing technology, scale-up, site, demand, and finances in a report with findings and red flags.
Detailed design, procurement, and construction for a $100 million fly ash, bottom ash, and pyrites handling and transport conversion EPC project to meet Coal Combustion Residuals (CCR) environmental regulations.
Civil engineering design, permit coordination, and construction administration for the development of a 1.6-acre site for a 3,000-square-foot Zaxby's quick-service restaurant.
This effort included the detailed design and construction support to install a River Water Intake System and Raw Water Treatment system to support an Ammonium Nitrate Solution (ANSol) plant in Tennessee.
Owner’s Engineering and support during the pre-FID engineering phase (FEL3) for a new 20 million gallons per year Renewable Fuel Oil Production Facility.
Detailed design engineering to support the relocation of an existing 6,000-gallon clarifier and 2,000-gallon aeration tank into a new multi-story building extension at an operating sugar mill.
Conceptual engineering for a 960MW-DC,800MW-AC Photovoltaic Solar Farm, for which Isomer provided preliminary single lines, site layout and an annual production report.