This effort included the detailed design, permitting, and construction support for a $400 million, 850,000 sq. foot state of the art particleboard manufacturing plant.
This effort included detailed engineering on a four project Anaerobic Digestion to biogas program with site locations in Georgia and California. The facilities were located on existing dairy farms of approximately 12,000 cows each...
FEL1 preliminary engineering design for a first-of-a-kind 1KTPA facility to produce Cathode Active Materials for EV batteries, including scale-up from an existing lab-scale processes.
This project effort included detailed design and construction support for a turnkey, full-scale Ethylene Oxide production facility along the Delaware River.
Full-service conceptual design FEL2 services for the infrastructure project to support the Lithium Battery-grade 47ktpa Refrigerant and 10ktpa Electrolyte Facility Expansion projects at an existing chemicals plant in the southeast.
This effort included the completion of the conceptual design (FEL2) phase for a $5 million USD water sustainability program for an existing Fiber Optics facility with a goal to reduce water consumption at the site by 80%.
Isomer provided front-end engineering and project development services for a 10 ktpa electrochemical process for H2SO4 production, including alternatives analysis for carbon capture and a supplementary cementitious material co-product.
This effort included the FEL2, FEL3 and detailed design for a new glass furnace structure, raw material feed system, and packaging line for a reflective glass bead production facility.
This effort included the front-end engineering, detailed design, and construction oversight to convert all machine DC motors and drives to AC power. The PIVs were also replaced with AC motors.
Civil engineering design, permit coordination, and construction administration for the development of a 2.0-acre site for a 4,500-sf auto glass repair shop and 10,000-sf flex building.