EXPERIENCE

Biomass
9MW Biomass to Power Generation Facility

Heat and Material Balance (HMB) study and preliminary vendor engagement for a 9 MW biomass-to-power generation facility utilizing gasification to produce syngas and biochar, coupled with an ORC system for power generation.

Pulp & Paper
Paper Machine Dryer Section Vibration Analysis

Detailed design and structural dynamics engineering evaluation to analyze an existing paper machine dryer section for an unbalance issue at an existing facility.

Biomass
1MM TPY Bagasse Pellet Facility for SAF Production

Front-end engineering services for a pelletized bagasse feedstock facility supporting sustainable aviation fuel production at a co-located sugar mill, including bagasse handling, drying, pelletizing, utility upgrades, and carbon capture.

Biomass
Cellulose Insulation Technical Due Diligence

Isomer provided Technical Due Diligence for a proposed investment in a cellulose insulation manufacturer, reviewing technology selection, design, operations, execution strategies, and financial assumptions, and delivering a complete Red Flags report.

Power
Boiler Natural Gas Conversion

This scope consisted of full-cycle project support from front-end engineering through startup for the conversion of an existing power boiler from coal firing to natural gas at an existing paper mill. The project installed six new...

Chemicals
Sugar Mill Clarifier Building

Detailed design engineering to support the relocation of an existing 6,000-gallon clarifier and 2,000-gallon aeration tank into a new multi-story building extension at an operating sugar mill.