Pulp & Paper
100% Recycled Linerboard Machine

Detailed design, procurement, and construction support for a $300 million brownfield, 100% recycled (OCC) linerboard machine installation to produce premium and back ply liner.

Other
EPC Services for Bio-Energy Center

Detailed Design, Procurement, and Construction (EPC) services for a $130 million greenfield bio-energy center to generate cellulosic ethanol from yard and wood waste.

Other
400 TPD Water Treatment Sludge Gasification

This effort included developing a comprehensive independent engineering report to assess a biosolids-only downdraft gasification system. The gasification system is located in a repurposed building adjacent to a local sewage authority...

Mining & Metals
2,500 TPD Metallurgical Coke Facility

This project included a contract for detailed design following a transition from another engineering firm at less than 10% complete; however, construction activities had already begun in the field. The scope of the project...

Power
900K PPH Pet Coke Fired Power Island

The scope consisted of detailed engineering and procurement support for a brownfield energy project at an existing paper mill. The project included a circulating fluidized bed (CFB) boiler and double auto-extraction steam turbine generator...

Mining & Metals
3000 TPY Rolled Stainless Steel Products Expansion

Front-end engineering for the addition of a 3,000 TPY rolled ornamental stainless steel, high-frequency production line at an existing rolled tubes production facility.