EXPERIENCE

Pulp & Paper
20 TPD Molded Fiber Stock Approach Screening Study

Front end engineering study to evaluate the feasibility of installing pressure screening systems on existing stock approach loops at an ag-based pulp thermoforming facility.

Pulp & Paper
White Liquor and Recausticizing Optimization

Detailed Design for a $20 million white liquor optimization project consisting of a new three-story pressure disc filter process building, causticizer, clarifier and lime mud filter upgrades.

Pulp & Paper
Tissue Machine with Water Treatment

This effort included the detailed design and procurement support for a $400 million brownfield through-air-drying (TAD) tissue machine installation and supporting infrastructure. The facility design included all processes necessary...

Other
150K TPY Residuals Wood Pellet Plant

This effort centered around providing early-stage project development services for a brownfield wood pellet plant rated at 150,000 metric tons per year. Residuals from nearby sawmills made up all of the feedstock used for this project. ..

Power
15 TPD Hydrogen Production Facility

The effort included the front-end engineering and detailed design services for installing a 15 TPD Green Hydrogen Production and Liquefaction Plant on a greenfield site.

Power
Boiler Natural Gas Conversion

This scope consisted of full-cycle project support from front-end engineering through startup for the conversion of an existing power boiler from coal firing to natural gas at an existing paper mill. The project installed six new...