EXPERIENCE

4 MGD Wastewater Treatment System and Balance of Plant

Isomer provided multi-discipline FEL3 engineering for a new 4.0 MGD Wastewater Treatment System at an existing linerboard mill. Isomer collaboratively worked with the client to determine a best-fit approach for effluent treatment, including segregation of stormwater flows, through evaluation of the existing stream characteristics. A system vendor was engaged to provide the anaerobic and aerobic treatment technologies while Isomer led integration into the existing mill operations and Balance of Plant engineering. Key design deliverables included a water balance, Balance of Plant P&IDs, priced equipment list including firm system pricing, stormwater design, and preliminary engineering for process piping, electrical infrastructure, instrumentation, and support structures. Isomer successfully delivered the FEL3 Engineering package to support a total installed cost project estimate performed collectively by the project team, including a Construction Manager partner onboarded during FEL3.

Industry
Client
Confidential
Location
Tennessee, USA
YEAR COMPLETED
2024
Services Performed
FEED Package
Team Members Involved
Jon Colberg, PE
Brianna Bui
Graham Walker
Michael Curtis
Conner Eddy
Bert DaSilva, PE
Kyle Barnett
Joshua Marson, PE
Matthew Ninnemann, Jr.
Riley Butler, PE
Shawn Parmelee, PE
John Hoppe, PE
We've done it all