PROJECTS

Chemicals
Polymer Facility Capacity Increase

The scope of this effort consisted of front-end engineering for a significant capacity increase for an existing polymer facility. The facility produces high-performance elastomers used as replacements for rubber. The project team...

Pulp & Paper
Molded Fiber Facility Cooling Tower Study

FEL2 front-end engineering design to evaluate a deficient vacuum seal water cooling loop at an existing molded fiber facility and replace an undersized cooling tower and supply pumps.

Chemicals
Confidential Bioprocessing Facility FEL3

FEL3 front-end engineering design for a proprietary bioprocessing facility to utilize specially engineered microorganisms to synthesize bio-based chemicals and produce sustainable commodity products using renewable raw materials, like sugar.

Mining & Metals
3000 TPY Rolled Stainless Steel Products Expansion

Front-end engineering for the addition of a 3,000 TPY rolled ornamental stainless steel, high-frequency production line at an existing rolled tubes production facility.

Chemicals
1000 TPA Textiles Recycling Facility

FEL2 front-end engineering design for a first-of-a-kind 1000TPA facility to recover monomers from spent textiles via a proprietary chemical recycling process, including scale-up from an existing lab-scale processes.

Pulp & Paper
280 TPD Tissue Machine Process Air System

FEL2 Engineering and Owner’s Engineering Services for a 280 TPD Tissue Machine Process Air System Replacement project as part of a Fleet-wide Rebuild Program.