PROJECTS

Pulp & Paper
900 TPD Containerboard Machine Press Rebuild

FEL2 engineering and cost estimating for a containerboard machine rebuild project including forming, press, dryer, and vacuum system upgrades to improve sheet quality, efficiency, and production.

Chemicals
47K TPA Refrigerant & 10K TPA Electrolyte Facility

Full-service conceptual design FEL2 services for the infrastructure project to support the Lithium Battery-grade 47ktpa Refrigerant and 10ktpa Electrolyte Facility Expansion projects at an existing chemicals plant in the southeast.

Power
Biomass Boiler Capacity Increase

This scope consisted of front-end engineering and detailed design to increase the bark firing capacity of an existing combination boiler at a paper mill. Initial studies identified issues, and the project team proceeded...

Pulp & Paper
30 TPD Ag-Based Fiber Low Consistency Storage FEED Study

Front-end engineering study for a new low consistency storage tower and pump integrated into an existing 30 TPD ag-based fiber pulping process facility.

Power
900K PPH Pet Coke Fired Power Island

The scope consisted of detailed engineering and procurement support for a brownfield energy project at an existing paper mill. The project included a circulating fluidized bed (CFB) boiler and double auto-extraction steam turbine generator...

Chemicals
Cement Silos Loadout Improvement Study

Preliminary engineering support for a site logistics study at an operating cement manufacturing plant to improve truck circulation and loadout efficiency at finished cement silos.