EXPERIENCE

Chemicals
Chemical Railcar Containment Area Replacement

FEL2 preliminary study and detailed design engineering for a new concrete containment area for chemical railcar loading at an existing production facility.

Mining & Metals
Coking Portfolio Emissions Upgrades

This $150 million scope consisted of conceptual engineering, front-end engineering, and detailed design to meet an issued environmental consent decree at three similar yet unique metallurgical coking facilities...

Biomass
9MW Biomass to Power Generation Facility

Heat and Material Balance (HMB) study and preliminary vendor engagement for a 9 MW biomass-to-power generation facility utilizing gasification to produce syngas and biochar, coupled with an ORC system for power generation.

Biomass
1MM TPY Bagasse Pellet Facility for SAF Production

Front-end engineering services for a pelletized bagasse feedstock facility supporting sustainable aviation fuel production at a co-located sugar mill, including bagasse handling, drying, pelletizing, utility upgrades, and carbon capture.

Power
48MW Biomass Fired Boiler & Microgrid

This scope consisted of multiple layers of support for the re-development of a 48 MW biomass-fired power plant that had been moth-balled in the middle of the initial construction process. As the project found new life...

Power
Battery Storage and Solar Portfolio FEED Package

Isomer provided conceptual site layout, permitting, and conditional use application support for a portfolio of solar, battery storage, and hydrogen facilities across the US.