PROJECTS

Pulp & Paper
25 TPD Molded Fiber Facility Vacuum System Expansion

Front end engineering, detailed design, and Project Management and Construction Oversight services for a $3MM TIC project to expand an existing vacuum system at a 25 TPD ag-based pulp thermoforming facility.

Pulp & Paper
100% Recycled Linerboard Machine

Detailed design, procurement, and construction support for a $300 million brownfield, 100% recycled (OCC) linerboard machine installation to produce premium and back ply liner.

Pulp & Paper
15K TPY Ag-Pulp Molding Facility

This project included front-end engineering and project development support for a brownfield non-wood ag-based pulping and molding facility. The facility was designed to provide a finished product capacity of 15,000 bone-dry metric tons per year...

Power
Boiler Natural Gas Conversion

This scope consisted of full-cycle project support from front-end engineering through startup for the conversion of an existing power boiler from coal firing to natural gas at an existing paper mill. The project installed six new...

Pulp & Paper
280 TPD Tissue Machine Process Air System

FEL2 Engineering and Owner’s Engineering Services for a 280 TPD Tissue Machine Process Air System Replacement project as part of a Fleet-wide Rebuild Program.

Pulp & Paper
15 TPD Ag-Based Pulp Thermoforming Line Retrofit

Project Management and Construction Oversight services for a 15TPD ag-based fiber thermoforming line retrofit, including demolition of old equipment and design/installation of new equipment.