PROJECTS

Other
Waste Cellulose Processing Facility

Multi-discipline front-end engineering and estimating services for a facility using a proprietary process to convert waste cellulose into consumer product replacements.

Biomass
Biomass Boiler Alternative Fuel Firing Study

Front end engineering study to evaluate the feasibility of firing a secondary biomass fuel in three separate biomass boilers at an existing facility in an effort to reduce the consumption of the primary fuel source.

Pulp & Paper
150 TPD Ag-Pulp Molded Fiber Facility

Pre-FEL study and FEL1 design of a primarily greenfield 150TPD ag-based pulp molded fiber facility, including feedstock handling and separation, material storage, semi-chem pulping, stock preparation, and molding.

Chemicals
47K TPA Refrigerant & 10K TPA Electrolyte Facility

Full-service conceptual design FEL2 services for the infrastructure project to support the Lithium Battery-grade 47ktpa Refrigerant and 10ktpa Electrolyte Facility Expansion projects at an existing chemicals plant in the southeast.

Pulp & Paper
TAD Tissue Machine with Converting

This effort included the front-end engineering, detailed design, and procurement support for a $500 million greenfield through-air-drying (TAD) tissue machine installation. The facility design included all processes necessary...

Chemicals
Surfactant Reactor Addition

This effort included the FEL3 and detailed design for a new reactor structure, associated equipment and supporting insfras turecture at an existing surfactant production facility.